Palo Sign
Installed 10-4-10
DSC_1000.JPG
Delivery of 4 slabs from Hahn Quarry, Galena, Illinois
DSC_1027.JPG
Lowering the slab onto a trailer so it can be taken to Custom Rock Engraving of Marengo
DSC_0437.JPG
Brian Beaty welding the rebar cage for the base support of the sign
DSC_0557.JPG
Ralston Construction adding rock to the base and tamping it down
DSC_0562.JPG
Rebar base to hold 12 ton of concrete + 6.5 ton of sign
DSC_0598.JPG
M & D Concrete worked with the cement
DSC_0646.JPG
Jared Marks puts finishing touches on the base
DSC_0101.JPG
Lining up the rebar with the holes in the bottom - Doug Schneider/CRGC; Brent Yount; Tom Watson
DSC_0134.JPG
Getting ready to pull out straps and then wedges to finalize in place
DSC_0155.JPG
Tim Carson - Coonrod Wrecking & Crane Service

Palo Entrance Sign